Who it is for
Digital Waste Tracking software
Prepare for Defra reporting without creating a second reporting job.
Merlinium connects the receipt-of-waste record to the movement your operation already captures, helping permitted and licensed sites prepare for mandatory reporting from 1 October 2026 in England and Wales.

The operational problem
A separate portal or spreadsheet can turn every receipt into repeated entry, checking and chasing. That workload grows with every ticket and makes exceptions harder to control.
The outcome
Use the operational record as the starting point, validate the required information and keep submission responses and exceptions visible to the team.
What Merlinium changes
Less rebuilding.
More operational control.
Start with the smallest Merlinium route that removes repeated work and preserves a reliable movement record.
A practical workflow
One record, carried through the job.
Capture
Record the movement in the existing or Merlinium workflow.
Check
Validate the configured fields before submission.
Submit
Send eligible records and retain the response.
Resolve
Bring missing information and rejected records to the surface.
Built from live operations
Software shaped around the people doing the work.
Merlinium has been developed through weighbridge, quarry, workshop, stores, skips, reporting and compliance projects. Across 23 working business applications, that approach has removed repeated administration and made operational exceptions easier to see.
See the operational evidence
Questions buyers ask
Clear answers before you change anything.
Precise regulatory scope, integrations and implementation routes are confirmed against the operation. Official regulator guidance remains the source of truth for legal requirements.
When does receipt reporting become mandatory?
The current official timetable states 1 October 2026 for permitted or licensed sites in England and Wales, and 1 January 2027 for Northern Ireland and Scotland.
Is Merlinium listed by Defra?
The underlying reporting capability is proven through WyeTrack on Defra’s compatible-provider list. The precise Merlinium connection and approval scope is confirmed during implementation.
Do we need to replace our current system?
Not necessarily. Merlinium Connect is designed to work with an existing operational system where a suitable connection route is available.
Recommended route